top of page
Engineer inspecting a series of metal pipes on a wall while holding a tablet.

Compressed air pipework in Lincoln, designed and certified

Over 30 years of installation experience. Aluminium, steel and stainless options. Supplied and installed pipework is certified.

What better pipework changes on site

Pressure kept steadier

Thoughtful routing and sizing help air reach the point of use with less drop.

Expansion planned in

Future branches and changes can be considered before the first section is fitted.

Certified after installation

Testing and certification back up the finished network with clear proof of work.

Pipework that supports the compressor properly

A good compressor can still underperform if you poorly plan the pipework around it. Weak routing, awkward branches and unnecessary pressure drop soon show up as wasted energy and uneven air delivery. For sites in Lincoln, Gainsborough, and across the UK, we design and install compressed-air and air-transfer pipework for everything from straightforward workshops to large sites, widely spread systems, work at height, and unusual airflow demands. Materials include aluminium, galvanised steel and stainless steel, as well as Transair, John Guest, Air-Com and Mapress systems. The layout is shaped around how the site works, not copied from the last job and hoped for the best.

Industrial room with a network of metal pipes and filtration units on the walls, next to a large machine and tank.
Engineer inspecting a series of metal pipes on a wall while holding a tablet.

Planned for flow, drainage and future growth

Design decisions matter. We look at airflow, pressure drop, ring mains, branch connections, isolation points, drainage, access for maintenance and the chance that the site may need to expand later. From first assessment through routing design, installation, testing and certification, the aim is a network that stays dependable under real working conditions. Supplied and installed pipework is certified, which gives practical proof behind the finished job. That matters where the air system is expected to work hard every day and where a poor pipe run can quietly cost far more than people realise.

Frequently asked questions

What pipework materials do you install?

We work with aluminium, galvanised steel and stainless steel, along with systems such as Transair, John Guest, Air-Com and Mapress. The choice depends on the site layout, air demand and the working conditions around the network.

How do you decide on the layout of a new air line?

We assess airflow, pressure drop, route length, branch positions, isolation points, drainage and maintenance access. If expansion is likely later, that is factored in as well so the network is not boxed in from day one.

Is the installed pipework certified?

Yes. All supplied and installed pipework is certified after the necessary testing. That gives you clear confirmation that the finished network has been checked rather than simply fitted and left.

Engineer inspecting a series of metal pipes on a wall while holding a tablet.

Planning new compressed-air pipework?

Call us with your site layout, demand and expansion plans, and we'll help you shape a pipework design that works.

Contact us

T A Industries

Gibson Rd Caenby Corner Estate,
Hemswell Cliff,
Gainsborough,
DN21 5TL

​

Business hours

Monday : 08:00 - 16:30
Tuesday : 08:00 - 16:30
Wednesday : 08:00 - 16:30
Thursday : 08:00 - 16:30
Friday : 08:00 - 16:00
Saturday : Closed
Sunday : Closed

Find Us on Yell
  • Google Business Profile
  • Facebook

​

Terms of Use | Privacy & Cookie Policy | Trading Terms

© 2026. The content on this website is owned by us and our licensors. Do not copy any content (including images) without our consent.

bottom of page